Skip to content

For Immediate Service:

800-864-7717
    project image 1

    Project Overview:

    arrow icon
    Provided all trade support (mechanical, electrical and plumbing) for the demolition of an existing AHU located on elevated structure within the building.

    Market

    arrow icon
    • Industrial
    • Manufacturing

    Location

    arrow icon
    Big Spring, Texas

    Services Provided

    arrow icon
    • Maintenance

    Project Size

    arrow icon
    N/A

    Project Complexity

    arrow icon
    Existing AHU had to be disassembled, removed and replaced. The team modified the existing ductwork and steel structure for a new 50-ton AHU, assembled on-site on the elevated structure. Routed all new refrigerant, condensate and natural gas piping. Set two new condensing units. Also performed the successful installation of 10 split systems.